Many customers will ask, how to correctly install and debug the stainless steel reactor? 

There will be many later problems if the stainless steel reactor is installed incorrectly or not debugged properly. Next, 

i will explain to you how to correctly install and debug the stainless steel reactor?

How to correctly install and debug the stainless steel reactor?

1. Check whether the movable parts and fixed contacts on the front panel and rear panel are normal, remove the upper cover, and check whether the contact of the connector is loose, and whether there is damage or corrosion caused by improper transportation and storage.

 

2. When installing the kettle cover, prevent the sealing surfaces between the kettle body and the cover from colliding with each other. Place the kettle cover carefully on the kettle body according to the fixed position. When tightening the main nut, it must be tightened diagonally and symmetrically several times. The force should be even, and the lid of the kettle should not be tilted to one side to achieve a good sealing effect.

 

3. The high-pressure stainless steel reactor should be placed indoors. When multiple autoclaves are equipped, they should be placed separately. Each operation room should have an outlet directly leading to the outdoors or passages, and the equipment location should be well ventilated.

 

4. At the connection of the positive and negative nuts, only the positive and negative nuts are allowed to rotate, and the two arc sealing surfaces must not be rotated relative to each other. When all the nut pattern connectors are assembled, they should be coated with lubricating oil.

 

5. Rotate the revolving body on the kettle by hand to check whether the operation is flexible.

 

6. The needle valve is sealed by the line. Only need to gently rotate the valve needle and press the cover tightly to achieve a good sealing effect.

 

7. The controller should be placed flat on the operating table. The working environment temperature is 10-40℃, the relative humidity is less than 85%, and the surrounding medium does not contain conductive dust or corrosive gas.

 

8. After the operation, it can be cooled by natural cooling, water cooling or air cooling on the support. After the temperature drops, release the pressurized gas in the kettle to reduce the pressure to normal pressure (the pressure gauge shows zero), then loosen the main nut symmetrically and evenly, then remove the main nut, and then carefully remove the kettle cover and place it in On the stand.

 

9. After each operation, the residue on the body and lid of the stainless steel reaction kettle should be removed. The main sealing port should be cleaned frequently and kept clean. It is not allowed to wipe with hard objects or rough surfaces.